Installing Flexnet DC and Strengthening Front Support of Solar Panel Array

May 13, 2018

Today, we accomplished four primary tasks:

1) installed the Flexnet DC in the cockpit and routed the wires

2) installed the Mate3 on the dash and routed the Cat 5 cable back to the communication hub

3) installed the communication hub and neatly routed the wires into and out of it.

4) reinstalled some support bracing for the front of the solar panel array

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

2018 Solar Car Challenge (SCC) - Awards Ceremony in Palmdale, CA

July 23, 2018

1/2
Please reload

Recent Posts
Please reload

Archive